Email ID : grk@essarelectricals.in
+91-98 406 28053

FACILITIES


TESTING REQUIREMENTS


  • 1.    Transformer Oil Filtration machine capacity up to 1200 LPH to 12000 LPH (Ultra Vacuum filter plant)
  • 2.    Transformer oil testing kit up 100 KV Manual/ Motorized
  • 3.    Under Ground Cable fault finding kit up to 33 KV
  • 4.    60 KV AC / 70 KV DC Hi Voltage Test Kit for Testing of HV Panels / Cables up to 33KV System
  • 5.    Transformer Winding Resistance Meter with 10 A DC Source
  • 6.    Single Phase Manual Relay Test Kit
  • 7.    Three Phase Manual Relay Test Kit
  • 8.    3 Phase Energy Meter Test Kit for Energy Meter Testing
  • 9.    Transformer Turn Ratio Meter
  • 10.   Primary Current Injection Test Kit up to 2000 A for CT Ratio Test
  • 11.   Sweep Frequency Response Analysis (SFRA)
  • 12.   On Line Energy Meter Calibrator
  • 13.   Battery / Operated Digital Insulation Resistance Tester upto 10 KV
  • 14.   Thermography sonal Make KT - 150
  • 15.   Harmonics analyzer
  • 16.   Contact Resistance Measurement (Micro ohm meter) with 100 A DC Source
  • 17.   Battery Operated Digital Soil Resistivity Test Kit
  • 18.   Digital Multi meters & AC/DC Clamp on Ammeters
  • 19.   DC Power Source
  • 20.   Phase Sequence Indicator.